Structure and foundations
Freestanding versus attached construction, footing conditions, elevation and lateral bracing materially affect a deck quote.

Compare published per-square-foot prices for pressure-treated, cedar and composite decks, then explore the structural decisions behind every quote.
Planning resource: This guide provides general information. Check manufacturer specifications and the relevant municipality for your actual project, and compare written estimates.
| Deck category | Published installed cost per sq. ft. | Example 240 sq. ft. before job-specific extras |
|---|---|---|
| Pressure-treated | $30–$45 | $7,200–$10,800 |
| Cedar | $50–$75 | $12,000–$18,000 |
| Composite | $60–$100 | $14,400–$24,000 |
Source: JB Contracting ATX — Deck Cost Guide . These are third-party published ranges, not Omega Fence & Deck prices or promises.
Based on a local contractor's published installed-cost guidance, not this company's price list.
Actual prices depend on elevation, framing, stairs, permits, rails and material specification.
Freestanding versus attached construction, footing conditions, elevation and lateral bracing materially affect a deck quote.
Guard design, stair count, lighting, gates and accessibility are scope items, not automatically included per square foot.
Composite product line, board profile, fastener system and edge treatment affect both installed cost and future repairs.
Demolition, hauling, bringing materials into a difficult yard and restoring landscaping may require separate allowances.
A deck budget is a package of structural work and finish materials, not just the price of the surface boards. A project with an elevated platform, difficult soil, stairs or guards can cost more than a larger, uncomplicated ground-level deck. Compare a common footprint and specification across bids rather than multiplying an online “average” by the square footage.
Example worksheet: for a hypothetical 12-by-16-foot deck, record 192 square feet of surface plus footing count, ledger or freestanding support, stair location, rail length, drainage provisions, demolition and access. Do not quote a completed price until those quantities and permit requirements have been established.
When evaluating composite versus wood, compare the total installed project including substructure, fasteners, trim, stairs and railings. A material with lower routine staining needs can still have color, heat, cleaning and manufacturer-specific installation requirements.
Tell us about the property, materials and project goals so the details can be reviewed in one place.
Sketch furniture, doorways, steps, access routes and the final deck height before estimating the square footage.
Ask whether the deck is attached or freestanding and what footing, beam, joist, ledger, bracing and corrosion-resistant hardware system is proposed.
List the exact surface product, fastening system, rail type, stair details, skirting, fascia, lighting and any built-in features.
Request line items for old-deck removal, permit fees, soil or rock work, landscaping, site access, waterproofing and change orders.
At one local contractor’s published 2026 range, a basic pressure-treated project at $30–$45 per square foot mathematically equals $7,200–$10,800 for a 240-square-foot surface. A cedar system at $50–$75 yields $12,000–$18,000; composite at $60–$100 yields $14,400–$24,000. These arithmetic examples are not comparable bids because their design assumptions may differ.
When comparing offers, isolate structure, materials, stairs, railings and demolition. An elevated deck with extensive access requirements cannot be estimated from a surface-only average. The right next step is a site review and itemized written proposal.